Industrial electrical work

SOURCING FORCE ONSITE · BME CONSULTING

Industrial electrical work:
keep your specialist

Switchboards, controls or installation alterations: retain your industrial electrical specialist. OnSite organises onboarding, the order and payment in coordination with your technical leads.

  • Your selected contractor
  • Onboarding within 24 hours
  • Sourcing against your brief

01 · YOUR PROJECT

How should you define an industrial electrical intervention?

Work on a machine, a standby power supply and a substation network addresses different needs. The quotation should identify the installation, the planned operations and the limits of the service. Separate design studies, supply, installation, testing and any independent inspection where they are distinct parts of the requirement.

Operating constraints matter from the outset: a shutdown window, night work, access to a sensitive area or interfaces with a controls specialist. An available electrician cannot begin merely because administrative onboarding is complete. The site and contractor prepare the technical conditions for the intervention.

  • Maintenance and fault finding on production electrical equipment.
  • Automation, programming and machine retrofits.
  • Switchboard alterations and standby power supplies.
  • Connections and networks associated with the installation.
  • Design studies and works with separate scopes where needed.

02 · YOUR PROJECT

Which documents and approvals should be prepared?

Adapt the administrative file to the work and the site. Evidence of competence, task-specific authorisation, insurance and requested documents should correspond to the people and operations actually planned. OnSite tracks the agreed documents; your technical leads assess their suitability for the job.

Clearly allocate responsibility for access to installations, safe isolation, testing and return to service. Purchasing administration does not transfer those decisions. Define acceptance criteria and the documents to be handed over at completion before confirming the order.

03 · YOUR PROJECT

Which electrical projects are documented?

At Medtronic in Grenoble, France, an independent electrical specialist worked on studies to remove isolation transformers, execution drawings and preparation for a year-end intervention. The case combines preparatory tasks with the constraints of an operating timetable.

Lynred in Isère, France, ordered a switchboard, additional circuit breakers and assistance with starting and shutting down a generator. Goodyear in Amiens, France, also used a specialist to retrofit a reconditioning machine and program its PLC. These are specific, documented scopes; contractor names and order values are not published.

04 · YOUR PROJECT

How do you engage your contractor or request sourcing?

Send the quotation, company contacts, site and preferred date. Administrative onboarding of a selected contractor is planned within 24 hours with a complete file. Mobilisation on site depends on availability and electrical preparation, with a separate timetable.

If you need a company, the sourcing brief should specify the equipment, competence and operating constraints. The administrative or sourcing fee is 3–12% of the service value excluding VAT, as confirmed in the approved proposal. Electrical work can sit within our industrial maintenance offer or a programme of building works.

05 · YOUR PROJECT

What needs specific preparation for this trade?

Prepare electrical work around the installations and operations actually entrusted to the contractor: connections, switchboard maintenance, controls, standby power or work near a substation. Specify the voltage range, equipment and responsibilities of the installation manager, people carrying out isolation and the executing company. In the UK, assess competence and the site’s authorisation for the particular task; a training certificate alone is insufficient evidence for every electrical operation.

Gather drawings, continuity-of-service requirements, shutdown windows and interfaces with other trades to create an actionable specification. Ask for a description of the work, tests and completion documents. Identify access to electrical rooms and site induction arrangements. If a generator or standby supply remains in operation, have competent people address that configuration in the technical preparation. Include any task-specific fitness or other requirements where relevant to the assessed work.

OnSite organises the contract and administrative follow-up for your selected company, or sources one against your specification. The contractor executes the works; the site manages its installations and contributes to coordination of overlapping activities. Onboarding within 24 hours requires the necessary file and approvals. It is neither permission to access an electrical installation nor approval to work live. HSE guidance on electrical competence is available at https://www.hse.gov.uk/electricity/faq.htm .

CLIENT EXPERIENCES

Different trades. A consistent process.

« Civil and utility works managed like an ordinary purchase »
Medtronic (Grenoble)
Roads and utility networks
Grenoble, France
« Critical work for business continuity, organised quickly »
Lynred
Backup power and electrical works
Isère, France

YOUR QUESTIONS

Preparing your contractor work.

Can we keep our industrial electrician?

Yes, subject to the company’s file, the work scope and the accepted contractual arrangement. Your competent technical leads still assess whether the contractor is suitable for the actual installation and task.

Can work start within 24 hours?

The 24-hour period covers administrative onboarding of a selected company with a complete file. The physical start depends on availability and technical preparation.

Who assesses electrical competence and authorisation?

The agreed evidence is tracked in the contractor file. Competent people assess its suitability for the individuals, operations and site. A training record does not automatically authorise every type of electrical work.

Can you find a controls specialist or electrical contractor?

Yes, against a specification. The search timetable is agreed according to the skills, equipment, location and availability required.

What costs should we allow for?

The administrative or sourcing fee is 3–12% excluding VAT. The rate and conditions are confirmed before commitment.

YOUR NEXT PROJECT

Your local contractor. One supplier.

Describe the trade, UK site and dates. Jonathan Morris discusses onboarding or sourcing with you.

Discuss my project