
How it works
From the first quotation to payment, follow a clear route for your selected maintenance or building contractor.
Explore →
SOURCING FORCE ONSITE · BME CONSULTING
HVAC, electrical work, plumbing and repairs: retain your local contractors. OnSite brings their onboarding, orders and payment into one process for your buildings and sites.
01 · YOUR PROJECT
An industrial building does not always need the same specialists as the production line. A failed heat pump, a leak, roof access or a door repair requires a specific skill and sometimes a nearby contractor. Across a business with several sites, these purchases accumulate even though no individual supplier represents significant spend.
The difficulty arises when facilities staff have a quotation but cannot issue the purchase order. Central teams must handle another supplier, gather its documents and check the invoicing process. The sites, meanwhile, are waiting for equipment to return to service or a repair to be completed.
OnSite addresses that administrative fragmentation. Sourcing Force, BME Consulting’s platform, provides the purchasing route for selected contractors under the arrangement accepted by your organisation. One relationship can cover several sites and trades, with visibility of expenditure rather than a succession of isolated supplier accounts.
02 · YOUR PROJECT
Multiple-trade building maintenance covers the equipment and fit-out needed to keep premises working. Establish the distinction from production maintenance at the outset: restoring office air conditioning does not involve the same acceptance criteria as a PLC retrofit.
We can organise purchasing for HVAC, electrical work, plumbing, locks, metalwork, floor refurbishment or work-at-height access. A programme combining several packages is possible, provided you define what each company will do, the interfaces and who will approve each completed task.
A general building contractor can be selected for a package of works, or you can retain several specialists. OnSite handles the agreed administrative process. Studies, technical coordination, checks and acceptance must have explicit owners: one purchasing supplier does not by itself create a construction management or design coordination appointment.
03 · YOUR PROJECT
1. The site describes the problem, supplies available quotations and identifies the equipment concerned. We record the trade, site, period and approver. This connects orders to the correct cost centre and distinguishes a repair from an annual programme.
2. Each selected contractor is assessed against its service. Relevant administrative documents, insurance and evidence are tracked, including through Vigilegal. Onboarding within 24 hours applies to a selected contractor with a complete file; sourcing a new company follows a timetable agreed against the specification.
3. The contractual route and order are prepared. Site teams and contractors arrange access, work periods and safe working conditions. If two packages overlap, responsibility for operational coordination must be assigned before the work starts.
4. The site confirms completion. Differences, extra visits and scope changes are documented. Invoices are reconciled with the services accepted, then paid under the agreed arrangement. A blocked invoice or addition requiring resolution can also be reviewed with Buy Made Easy as an administrative intermediary after the file has been accepted. Consolidation and reporting are defined for your organisation’s requirements.
04 · YOUR PROJECT
A building services maintenance contract can include a permanent technical organisation, planned visits and service commitments. OnSite answers a different purchasing requirement: engage the companies you have selected for one or several trades. Both approaches can coexist when a comprehensive contract does not cover a particular repair or site.
| Situation | Comprehensive building services contract | Direct management by the site | OnSite purchasing route |
|---|---|---|---|
| Ongoing maintenance of several installations | Technical scope and service level to define | Separate contracts to manage | Purchasing coordination for selected contractors can be assessed |
| Local specialist for a repair | Check inclusion and contractual terms | Additional supplier onboarding | Handling of the selected company |
| Remote or secondary site | Check actual coverage | Local sourcing and administration | Sourcing possible against a specification |
| Technical acceptance | Under the maintenance provider’s contract | Site supervisors and contractors | Site supervisors and contractors |
05 · YOUR PROJECT
For LFB, documented work in Lyon and Mions, France, includes heat pump refurbishment and a climatic chamber repair. These examples illustrate the need to handle a specific item of equipment with a competent company without imposing a new supplier process on the site for every breakdown.
Corning’s references include fire protection and generator maintenance. Corning Pouyet also commissioned a boiler-room refurbishment, flooring and wall works, and partitioning of an IT office. In each case, the purchase needs to reflect the actual scope ordered and the way it will be accepted.
Boralex engaged contractors for wind-turbine access doors, a roof with a lifeline, reversible air conditioning and solar panel cleaning at sites in France. At remote sites, proximity and access conditions matter as much as processing the order. These examples retain their original locations and are not relabelled as UK projects.
06 · YOUR PROJECT
A useful request identifies the building, equipment, trade, quotation and person who will check the result. Those details help avoid an invoice that cannot be reconciled several weeks after the work. When several sites use the model, approval rules and expenditure categories are agreed together.
The fee of 3–12% of the value excluding VAT is stated before commitment. The rate depends on the agreed service, whether administrative coordination or sourcing is included. Payment terms, invoice presentation and reporting are specified in the arrangement. Your contact can then compare the explicit service cost with the internal administrative workload potentially avoided.
CLIENT EXPERIENCES

« Quick repairs, including away from our main sites »
« A mechanical team available week after week, with a clear purchase order for each period »
YOUR NEXT PROJECT
Describe the trade, UK site and dates. Jonathan Morris discusses onboarding or sourcing with you.
Discuss my project