Asbestos removal:
keep your specialist

Purchase asbestos work through a structured route for your selected specialist. OnSite organises administrative onboarding, order milestones and payment, alongside the project’s technical and safety preparation.

  • Your selected contractor
  • Onboarding within 24 hours
  • Sourcing against your brief

01 · YOUR PROJECT

Why define the asbestos work before discussing a timetable?

The term asbestos removal is not a sufficient specification. Identify the structures, affected materials, available information, removal or intervention scope and site constraints. Required documents and methods depend on the technical classification of the actual work.

On an operating industrial site, interfaces with production and other companies are decisive. Distinguish site establishment, work stages, clearance and demobilisation, and acceptance. Competent people define the conditions before the contractor mobilises; rapid administrative onboarding cannot bypass that preparation.

  • Technical scope documented before placing the order.
  • Specialist company and appropriate competence or licence checked.
  • Site establishment, work and demobilisation stages identified.
  • Operating constraints and interfaces with other packages.
  • Acceptance criteria and completion documents defined.

02 · YOUR PROJECT

What is OnSite’s role in a sensitive contractor file?

OnSite organises the administrative and contractual relationship within the arrangement accepted by your organisation. Relevant documents are tracked according to the agreed scope, including through Vigilegal. Document collection must remain distinct from technical classification of the asbestos task.

Competent professionals assess asbestos requirements, people and methods. A precise description allows appropriate conditions to be set before ordering. Different types of operations require different files: purchasing administration is not an automatic guarantee of technical compliance.

03 · YOUR PROJECT

Which projects are documented?

The Goodyear France references include an asbestos-removal project in two phases, with establishment and demobilisation, carried out by a certified company under the French framework. The purchasing circuit followed the job from quotation to acceptance, including the stages specific to that project.

ASSA ABLOY France also entrusted administrative preparation, asbestos-removal works and demobilisation. This reference shows the value of following all purchasing stages. It does not authorise publication of detailed methods, sensitive locations or order data, and is not presented as a UK licensed-work reference.

04 · YOUR PROJECT

How should a request be prepared?

Send the quotation, available scope information, selected company and responsible project contacts. Onboarding within 24 hours concerns a selected contractor with a complete file and confirmed purchasing arrangement. It is neither a preparation period for asbestos work nor a promise that the site work will begin within that time.

If a company must be found, sourcing follows a specification and assessed requirements. Its timetable depends on the file and availability. The administrative or sourcing fee is 3–12% excluding VAT, confirmed before commitment. The service can join a building works programme with distinct milestones and responsibilities.

05 · YOUR PROJECT

What needs specific preparation for this trade?

Begin with an asbestos survey appropriate to the nature and extent of the planned disturbance. UK rules distinguish licensed work, notifiable non-licensed work and other non-licensed work; France’s SS3 and SS4 categories must not be carried over as UK classifications. Short duration or low cost alone does not decide the category. Assess the material and task before selecting the company and checking the necessary licence, training and arrangements.

Provide available reports, zones, materials, estimated quantities, occupancy and access conditions. Ask for the work stages, intervention documents, protection arrangements and waste management. Identify applicable inspection, clearance and handover requirements. Examine interfaces with production, other contractors and occupants before starting. A general asbestos record does not automatically satisfy the information needed for a specific opening, strip-out or removal.

OnSite organises the agreed contractual and document process for the specialist company. Classification of the work, safety decisions and clearance conditions require competent participants. Administrative onboarding within 24 hours does not promise an asbestos job ready to start in that period. Sourcing depends on the specification, competence and preparation needed. HSE explains the licensing framework at https://www.hse.gov.uk/asbestos/licensing/index.htm ; use the relevant Northern Ireland regulator for work there.

CLIENT EXPERIENCES

Different trades. A consistent process.

« A sensitive project managed from quotation to acceptance »
Goodyear France
Asbestos removal
Industrial site, France
« BME handled the administrative files that usually slow down these projects »
ASSA ABLOY France
Demolition, asbestos removal and metalwork
Industrial site, France

YOUR QUESTIONS

Preparing your contractor work.

Does OnSite carry out asbestos removal?

The selected specialist company, suitable for the assessed scope, performs the work. OnSite manages the agreed administrative and contractual purchasing route.

Who classifies the task and applicable requirements?

Competent project professionals and responsible parties. Define the actual work before selecting the required documents, competence, licence and methods under the relevant UK jurisdiction.

Does onboarding within 24 hours allow an immediate start?

No. It concerns a selected contractor’s complete administrative file. Preparation and the asbestos work programme remain separate.

Can several work phases be distinguished?

Yes. Establishment, intervention stages, demobilisation and acceptance can be described separately in the contract and orders.

Can you find a specialist company?

Yes, against a specification and assessed requirements. The timetable and administrative or sourcing fee of 3–12% excluding VAT are agreed before commitment.

YOUR NEXT PROJECT

Your local contractor. One supplier.

Describe the trade, UK site and dates. Jonathan Morris discusses onboarding or sourcing with you.