Building works

SOURCING FORCE ONSITE · BME CONSULTING

Building works:
simplify trade purchasing

Keep building work moving without multiplying supplier accounts. OnSite helps you purchase from building companies, from the first quotations through to invoicing, alongside the people supervising your project.

  • Your selected contractor
  • Onboarding within 24 hours
  • Sourcing against your brief

01 · YOUR PROJECT

How do you buy building works when each package has its own contractor?

On an operating industrial site, building work rarely arrives as a single, neatly defined contract. You may need an opening in a wall, waterproofing, a replacement door, a new floor or a steel structure. The project manager knows suitable local companies, but every work package can trigger another supplier onboarding process.

That fragmentation matters when quotations change, progress payments fall at different times and the site has to explain its administrative requirements to each business. A general contractor can coordinate technical work without necessarily solving the purchasing arrangements for specialist companies that you select for a single job.

Sourcing Force OnSite brings these purchases into the circuit agreed with BME Consulting. You retain the technical choice of companies and the organisation of the works. OnSite prepares the contractual arrangements, document tracking and payment process so that purchasing does not require a separate supplier account for every package.

02 · YOUR PROJECT

Which building work packages can be discussed?

The service can cover building, civil engineering, fit-out, metalwork and roofing businesses, for one work package or a programme of orders over the year. First define the works, what is supplied and installed, the exclusions and the interfaces with other trades. A short job still needs a clear boundary between the contractor’s scope and the site’s responsibilities.

Asbestos, work at height, electrical work and overseas projects require additional preparation. The administrative file must reflect the task and its setting; competent people still assess working methods, studies and technical compliance. A collected document does not by itself demonstrate that a contractor is suitable for a hazardous activity.

  • Partitioning production areas and offices.
  • Floor finishes, waterproofing and roof repairs.
  • Roads, utilities and groundworks.
  • Fabrication and installation of steel structures.
  • Roofing, cladding, joinery and access alterations.
  • Specialist work requiring appropriate competence and qualifications.

03 · YOUR PROJECT

How does a building works purchase proceed?

1. Define each package with the selected company, its quotation and the scope boundaries. Identify milestones and who accepts the work. A single final acceptance, intermediate milestones and progress claims require different supporting evidence: decide which arrangement applies before placing the order.

2. Prepare the contractor file and the documents required for the job. Vigilegal supports document tracking. The 24-hour commitment concerns administrative onboarding for a contractor already selected, with a complete file; it does not promise a physical start on site within 24 hours.

3. Confirm the contractual arrangement and order against the accepted scope. The client coordinates access, health and safety and the technical organisation of the project. For UK construction work, the relevant CDM roles must be explicitly identified: the purchasing circuit does not assume those roles merely by handling an order.

4. Accept the agreed milestones, record outstanding items and formalise variations. Invoicing and payment follow the conditions agreed for the work that has been authorised and accepted. Additional work needs an approved change rather than an unexplained extra on the final invoice.

04 · YOUR PROJECT

How does OnSite compare with a general contractor?

A general contractor may take responsibility for technical coordination across several work packages under its construction contract. OnSite provides a purchasing arrangement for a general contractor or for individual specialist companies. The decision therefore depends on whether you need technical coordination, a practical way to purchase from selected companies, or both under clearly defined responsibilities.

How does OnSite compare with a general contractor?
Point to decideGeneral contractorCompanies purchased directlySourcing Force OnSite
Who carries out the work?The general contractor and its subcontractors.Companies selected by the client.Companies selected by the client.
Who coordinates technical interfaces?As specified in the general contractor’s contract.The client or its designated coordinator.The client or its designated coordinator.
How are suppliers onboarded?Depends on the contractual arrangement.A supplier account and follow-up for each company.Through the agreed Sourcing Force purchasing arrangement.
What costs are compared?The building works contract price.Each contractor’s price plus internal administration.The contractor’s price plus an agreed fee of 3–12% excluding VAT.

05 · YOUR PROJECT

Examples of building works handled through this arrangement

At Goodyear in France, an annual programme included partitions for a room used for substances classified as carcinogenic, mutagenic or toxic to reproduction, roof terrace waterproofing and openings for ventilation systems. Different trades and different types of evidence had to fit into a coherent purchasing process.

At Medtronic in Grenoble, France, civil works included demolition, pipe bedding and waste removal. At Siemens Energy in Grenoble, metalwork involved studies, workshop fabrication and installation, with quality and milestone requirements. These actual French projects illustrate why acceptance and supporting documents must follow the work package.

At Siemens in Vienna, Austria, a general contractor worked on medium-voltage rooms. This international reference keeps its actual location: it does not establish a UK project or imply automatic coverage in every country. The purchasing and contractual arrangements for each overseas requirement must be assessed separately.

06 · YOUR PROJECT

What should you send to prepare your request?

Send the quotation, the place of work, available plans, the programme and the person responsible for accepting the work. Explain any constraints associated with ongoing production, restricted roof access, sensitive rooms or an adjacent package that has already started. These details help establish the order scope and the interfaces that your site must manage.

The administrative or sourcing fee is 3–12% of the service value excluding VAT and is agreed before commitment. If no contractor has yet been chosen, the search timetable is defined against the brief. For a programme of works, common order and approval rules can make successive packages easier to follow without removing the technical requirements of each job.

CLIENT EXPERIENCES

Different trades. A consistent process.

« All our annual works use the same process, with quotations and progress claims tracked »
Goodyear France
Annual building works programme
Industrial site, France
« Civil and utility works managed like an ordinary purchase »
Medtronic (Grenoble)
Roads and utility networks
Grenoble, France

YOUR QUESTIONS

Preparing your contractor work.

Does OnSite act as a general building contractor?

OnSite organises the purchasing, contractual, document tracking and payment arrangements agreed with BME Consulting. The companies carry out the work. Technical coordination, design and construction responsibilities must be expressly allocated in the project arrangements.

Can we retain our usual general contractor?

Yes. Send its quotation and the proposed scope so that the file and purchasing route can be reviewed. If specialist companies are also involved, define their packages and interfaces clearly and identify who coordinates the works.

Can building work start within 24 hours?

The 24-hour commitment applies to administrative onboarding of a selected contractor with a complete file. A physical start depends on availability, the order, access, safety preparation and any technical prerequisites. These are assessed separately.

How are additional works handled?

Describe the change, obtain a revised quotation and secure the appropriate approval before the additional work is invoiced. Keep the authorised variation with the original order and the evidence of acceptance.

Can the arrangement handle progress claims?

Yes, where the contract and purchase order define the milestones, supporting documents and acceptance rules. Progress claims must correspond to an agreed stage of work rather than an assumed payment timetable.

Who checks insurance and site safety?

OnSite tracks the documents included in the agreed contractor file. The client and competent project participants determine the insurance, competence, working methods and safety arrangements required for the actual work. Applicable UK CDM duties remain with the relevant dutyholders.

Can you discuss works outside the UK?

Yes. Specify the country, contracting entities and place of work at the outset. The contractual, tax and local requirements must be assessed before confirming the arrangement; an international reference is not a guarantee of universal coverage.

What is the service fee?

The administrative or sourcing fee is 3–12% of the service value excluding VAT. The rate, included services, currency and tax treatment are confirmed before you commit.