How it works

SOURCING FORCE ONSITE · BME CONSULTING

OnSite:
how contractor purchasing works

From the first quotation to payment, follow a clear route for your selected maintenance or building contractor. Define the need, prepare the file, approve the order and accept the work with the people responsible at your site.

  • Your selected contractor
  • Onboarding within 24 hours
  • Sourcing against your brief

01 · YOUR PROJECT

Start with the work your site actually needs

An industrial company, installer or maintenance team may need a contractor for a factory, building, energy installation or end customer’s site. The requirement can be occasional even when its technical importance is high. OnSite helps organise the purchase without creating an unnecessary supplier account for every company involved.

Sourcing Force OnSite works through BME Consulting. The selected company remains responsible for carrying out its work; the client defines the required result, operating constraints and acceptance. The service prepares the agreed administrative, contractual, document tracking and payment circuit around these roles.

The first exchange establishes whether that circuit fits the requirement and your internal purchasing process. Supplier onboarding and contractual arrangements must be accepted by the relevant parties. The service does not impose approval rules that your purchasing, finance or project teams have not agreed.

02 · YOUR PROJECT

1. Send the quotation or a contractor sourcing brief

If you have chosen a company, send its quotation and contacts with the site, dates and acceptance contact. Check whether the price includes labour, parts, travel, transport, plant and storage. Resolve ambiguities before the order: a quotation that leaves a key boundary unclear will be harder to accept and invoice later.

If no company has been selected, describe the trade, equipment or works, site constraints, deliverables, choice criteria and timetable. The contractor search is a separate stage. Its duration depends on the brief and availability; it is not covered by the 24-hour administrative onboarding commitment for a selected company.

Identify the people involved. The project manager describes the need, purchasing approves commercial terms, the site prepares the intervention and a named person accepts the result. The contractor and finance teams need to understand that route, including who can authorise an additional charge.

  • Requesting company and professional email address.
  • Actual UK site, postcode, region and required trade.
  • Selected contractor’s quotation or a sourcing specification.
  • Expected dates and operating or access constraints.
  • Technical contact and person responsible for acceptance.
  • Internal purchase order and approval process.

03 · YOUR PROJECT

2. Prepare the company’s file and job-specific documents

The required file depends on the company, the trade and the work. Electrical maintenance, building work and lifting operations do not call for identical documents. Vigilegal supports tracking of the items included in the agreed arrangement, together with the client’s requirements for the intervention.

For a company already selected, administrative onboarding can be completed within 24 hours when the file is complete. Missing information is identified. This commitment does not establish contractor availability, remove site restrictions or promise that the physical work itself will be completed or started within that time.

Sensitive work requires assessment by competent people. Collecting an insurance certificate, training record or method statement does not certify technical suitability by itself. The client and relevant dutyholders determine what the task requires and whether the evidence, people and arrangements are appropriate.

04 · YOUR PROJECT

3. Agree the service, contract and purchase order

The proposal states the administrative or sourcing fee, within the 3–12% range excluding VAT, and the scope before approval. Compare it with the alternatives relevant to your organisation, including internal onboarding and administration. Currency and tax treatment must be agreed for the actual contracting arrangement.

The contract and order connect the quotation to the programme and acceptance milestones. Design, fabrication, delivery and installation may have separate stages; maintenance may be accepted by period; a short visit may have one final acceptance. Define those arrangements before the contractor starts.

The site and contractor teams organise access, overlapping activities and health and safety. For UK construction work, consider the applicable CDM arrangements and task-specific risk assessments and method statements. Identify the responsible people explicitly: purchasing administration does not replace their statutory or technical duties.

05 · YOUR PROJECT

4. Accept the work and follow the invoice through to payment

Accept completion or the agreed milestone, record reservations and distinguish additional work from the original scope. This gives finance a link between the invoice and an accepted service. It avoids reconstructing the history from emails when the contractor is already asking for payment.

An extension or variation needs to be formalised with the appropriate quotation and purchase order approval before invoicing. At Finorga in Mourenx, France, a rope-access insulation intervention was extended by several days. The reference illustrates the need to reconcile actual authorised work with the final charge.

Explain the payment terms to the contractor from the outset. A special due date or accelerated arrangement must be assessed before contracting. There is no universal promise of immediate payment: the timetable depends on the agreement, supporting documents and required approvals.

06 · YOUR PROJECT

Keep administrative progress and site progress distinct

An onboarded company is not automatically authorised to enter the site, and an issued order is not proof of acceptance. Name the person responsible at each stage so that the site, purchasing, finance and contractor know what has been approved and what remains to be prepared.

Keep administrative progress and site progress distinct
StageWhat you send or approveWhat is prepared
RequirementQuotation or specification, site and contacts.Defined service or sourcing scope.
Contractor fileSite requirements and selected company details.Administrative onboarding and document tracking.
OrderProposal, budget and internal approval route.Defined contractual arrangement and purchase order.
AcceptanceCompletion, reservations and approved variations.Invoicing and payment under the agreed terms.

07 · YOUR PROJECT

Adapt the route to the duration and type of work

At Siemens in Grenoble, France, design, fabrication and installation involved successive stages. Maintenance for Corning and a programme of work for Goodyear required different periods and milestones. These actual references show why a shared purchasing route must still reflect each job’s duration, supporting evidence and acceptance rules.

Use the request form to explain your UK requirement to Jonathan Morris. For work in another country, state the location and contracting entities before any commitment so that local requirements can be assessed. Independent professionals and company events have their own routes through Sourcing Force Talents and Sourcing Force Events.

CLIENT EXPERIENCES

Different trades. A consistent process.

« An overseas project, a leading local contractor and one purchasing contact on the French side »
Siemens Energy (Grid Technologies)
Electrical substation modifications
Vienna, Austria
« A mechanical team available week after week, with a clear purchase order for each period »
Corning SAS
Continuous mechanical maintenance
Production site, France

YOUR QUESTIONS

Preparing your contractor work.

What information is needed to start?

Send your company details, the actual site and postcode, trade, dates, selected contractor’s quotation and contacts, or a sourcing brief. Identify the technical contact, acceptance owner and internal purchasing route.

What is included in the 24-hour commitment?

Administrative onboarding of a selected company with a complete file. Contractor sourcing, physical mobilisation, site permissions and completion of the work have separate requirements and timetables.

Can we start without a selected contractor?

Yes. Describe the work, site constraints, required competence, dates and selection criteria. BME defines the sourcing scope and timetable with you before launching the search.

When do we know the fee?

The proposal confirms the administrative or sourcing fee and included services before commitment. The range is 3–12% of the service value excluding VAT, with currency and tax treatment agreed for the purchase.

Who accepts the contractor’s work?

The person designated by the client for the job or milestone. Record the acceptance, outstanding items and any approved extras so that invoicing corresponds to work that has been authorised and accepted.

How are extra works or additional days handled?

Describe the change, obtain the appropriate quotation and approve the variation or purchase order adjustment. Keep the authorised change with the original file before processing the additional invoice.

Is payment immediate?

Payment follows the agreed terms, supporting evidence and approvals. If the contractor needs a particular due date, discuss it before commitment. Administrative onboarding does not by itself trigger an immediate payment.

Who is the contact for an English-language UK request?

Jonathan Morris is the English-language contact for the UK route. Use the request form with the actual place of work and purchasing context. A UK regional page does not imply a local BME office.

YOUR NEXT PROJECT

Your local contractor. One supplier.

Describe the trade, UK site and dates. Jonathan Morris discusses onboarding or sourcing with you.

Discuss my project